TechnipFMC has been awarded a second iEPCI contract from Statoil
The ongoing EPC project covers the provision of subsea equipment including template structure, manifold and two subsea trees including wellheads and modifications of control systems to the Visund Nord Improved Oil Recovery project, whereas the extension includes installation of the template structure and manifold as well as delivery and installation of flowline spool and umbilical. The project will be executed as an integrated Engineering, Procurement, Construction and Installation (iEPCI).
According to H. Hasselknippe from TechnipFMC, this is the second iEPCI contract with Statoil, following the Trestakk project.