Wood Group has been awarded a two contracts by BP related to Mad Dog 2 Project

The BP's Mad Dog platform (By Cndn Bacon at English Wikipedia, CC BY-SA 3.0, Link)

The BP’s Mad Dog platform
(By Cndn Bacon at English Wikipedia, CC BY-SA 3.0, Link)

Wood Group has won two separate contracts related to BP’s Mad Dog 2 project, providing engineering services to develop deepwater production, after being contacted by Samsung Heavy Industries to provide detailed engineering and procurement services for the topsides for BP’s Mad Dog Phase 2 floating production unit. The $80 million contract follows the December 2016 completion of Interim Agreement Period (IAP) early work, which was valued at $4.5 million.
Additionally, as part of the recently signed global services agreement with BP, Wood Group’s Specialist Technical Solutions (STS) business was awarded a $4.89 million contract for Subsea Engineering and Project Management Services to the Mad Dog 2 project. That work includes gas lift system interface design, geospatial information system support, subsea controls engineering and geotechnical engineering support.
Mad Dog 2 is the second platform designed by Wood Group for BP in the Gulf of Mexico Mad Dog field.